Ram Entry #7
"Chapter 7"
3rd November
Today, I had to be at two places at the same time. First, Cleo's house where our team had decided to gather for mass producing the terrariums for the upcoming November event. Subsequently , I had to be in school for a group project due on the 5th November to integrate mine and my partner's work.
I was assigned the job of purchasing the soil for the making of terrariums as such I had to travel to Hua Hng.
From there, I grabbed down to Cleo's place. I expected myself to arrive at her place the earliest within the group. However, I was the last to reach as I got down ahead of my actual destination which led me take quite a long walk to her house.
Upon reaching, everyone had started preparing the materials and displayed them on the table. The plants bought from pick a plant came in boxes.
To start off , we began deciding on the systematic process flow of the terrarium. Pebbles, Soil, Plant rooting and Designing using the seashells, name beads and colored sand. Although it may seem like a easy process, I personally observed that to make one terrarium it took me a good 15 mins average and we had a long way to go at it.The replication was not 100% but we managed to get 18 number of terrariums within the lunch time.
During lunch we discussed on finalizing the plans we had initially thought through for the terrariums and I had to leave after that.
Overall, I felt that our progress slow as we were handling the plants delicately and ensuring that the design was similar to our prototypes during the making process. It was quite awful to leave my group mates to continue but I had no alternative as I was also required facing a project completion due on the 5th November which had to be completed by me.
The next Phase was continuing the mass production as this session was not enough and did not meet the number as expected.